Phase II Engine install:

10/09/2004

HOME

On Friday afternoon  (10/10) I finally got the built engine back from the machinist.

A thing of beauty

Ported & polished exhaust ports

There is still have some assembly required prior to installation in the car. The flywheel, clutch, transmission, new motor mounts, etc; etc.

Flywheel installation

THE CLUTCH

Clutch aligned and installed

Aligning and installing transmission

All bolted up, now change the motor mounts.

Unusual view

Next up is change the motor mounts (new ones) some more detailing and drop this sucker into the car.

10/10/2004      Today I just did some final installs necessary with the engine out of the car. I am now in full launch status for the big drop in (poor choice of words) tomorrow.

Changed to the new motor mounts, installed the starter and knock sensor

Polished the valve cover